WIPs (new ones are bolded)
Ten Stitch Blanket, Caron Cakes (started 2019)
Bright Stripes Throw, Caron Anniversary Cakes (started September 5, 2024)
Cable Car Coat, Bernat Chunky Solids (Bulky) (started February 6, 2025)
Mini Mania Scarf II, leftover fingering-weight yarns (started February 18, 2025)
Winter Ribbed Scarf II, Mary Maxim Glimmer (not my yarn, started March 30, 2025)
Mindless on the Train, Lorna's Laces Shepherd Sport Multi (started August 26, 2025)
Fingerless Gloves "Musica", Laine Fav Socks (started August 28, 2025)
Compass, Lion Brand Mandala Sparkle (started September 7, 2025)
Trusty Toe Up Socks, Mary Maxim Perfectly Paired Duo (started October 31, 2025)
Hibernating
Dancing Bees MKAL, Debbie Bliss Rialto Lace (started 2015 - oops)
End of month yarn stats: 46 entries, 75 skeins, 22255.50 metres, 7925 grams.
I did nothing! Absolutely nothing! At least, from my goals (except the cold sheeping - I did that, unwillingly).
I haven't touched the projects from the Montreal trip, I haven't updated the MKAL project page with final pictures, and I certainly didn't share any pictures from the trip. I totally started two new projects (one specifically for a concert and one for Walter). I've been working at the Mini Mania scarf and that's gotten some of the fingering-weight yarn ends out of the stash.
We had a flood at work (water main break) and that's been quite the headache, since regular operations still have to proceed even during clean-up. We also had a trade show to attend (that was this last Monday to Thursday), so prep for that had to continue as well. It's been chaotic and fun - even the flood clean-up. It's really shown how well our work team comes together and gets stuff done.
October goals:
1. Update the MKAL project page with final pictures. At the very least, take the final pictures.
2. Cold sheep!!! We got this!
3. Finish something, anything, even if it's not a knitting or crochet project.
4. Make The Morpher.
I did think about the MKAL pictures and thought to myself, "You should get those pictures, eh?" but I was driving at the time and the thought was filed safely away in that back room in my mind long before I was home. Ah, well, maybe this month. (Yeah, right.)
Okay, October wasn't bad. Still successfully cold-sheeping, and I even finished a project from the summer! The hat that my mom asked for. The hat that I told her I'd finished and was ready for her. That she said, "Oh, for me? Why?" And now I know why my memory's crap.
The flood clean-up at work drags on, but we continue to chip away at it and we've got our customer service area back up and (mostly) running. We adapt. We are flexible. We will get through this.
November goals:
1. Create a reminder to take pictures of the MKAL project.
2. Maybe take those pictures?
3. No yarn buying!
4. Finish the crochet project (or get to a point where the yarn is used up and now Walter has to decide if it's big enough).
No comments:
Post a Comment